The data below is included for archival purposes.
The most current data that we have is available via our new searchable
database of ships at:
http://oceanic.cms.udel.edu/ships/
Ship Name: Miyagimaru (Japan) US NODC Code: 49MY Board of Education,Miyagi Prefecture
Contact:
Operator:
3-8-1 Honcho,Aoba-Ku
Sendai-Shi,Miyagi 980 Japan
Phone: 822 211-2111
Fax: 0222113638
Cable:
Email:
Length (M): 57.40 Range (n. mi.): Crew: 13
Beam (M): 9.30 Endurance (days): 80 Officers: 10
Draft (M): 3.70 Cruise speed (kt): 12.5 Scientists: 52
Gross Tons: 497 Max. speed (kt): 14.7 Air Cond.: yes
Power (HP): 1600 Aux. Power (HP):
Main vessel activity
Fisheries
Year built: 89
Ocean area where vessel operates: Pacific Ocean
Capacities and working spaces
Dry cargo holds: 0m3
Fuel: 346m3
Fresh water: 68m3
Wet laboratories (total area): 0m2
Dry laboratories (total area): 0m2
Fresh water generator capacity: 7m3
Freeboard to working deck: 0.0m
Free working deck area: 0m2
Space for container laboratory: 0m x 0m
Design Particulars
Hull materials: Steel
Energy sources
Main engine(s): number: 1 make: Diesel model:
Power (BHP) each main engine: 1600 at 395rpm
Diameter and max. rpm propeller: 0.000m 206rpm
Total power auxiliary diesels: 0HP
Electrical systems
AC Voltage: 0/ 225V, total 400kVA, 3phase, 60Hz
AC Voltage: 0/ 0V, total 0kVA, 0phase, 0Hz
DC Voltage: 0V, total 0V
Stabilized system for scientific equipment: 0VAC 0AMP 0Hz
Fixed equipment
Navigation and communication
Nav. equip: Radar Loran Decca SatNav Gyro EMLog
Comms: Fax SatCom
Comm sat:
GPS:
Acoustic
Echosounders for scientific research: 0kHz
Sonar:
Provisions for silent ship operation:
Oceanographic
Oceanographic winches: number: 0
Steel wire length: 0m, safe working load: 0tons
Conducting cable length: 0m, safe working load: 0tons
Trawl winch length: 0m, safe working load: 0tons
Other, specify:
length: 0m, safe working load: 0tons
Gantry
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Crane
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Other winches for instruments or sampling:
Electronic data processing equipment permanently available on board
Computer:
Vessel construction and maintenance supervision
Construction supervised by:
Classification Society:
Others, specify:
Published vessel data
Magazine: Gyosen Issue: 203 Date: 01-jun-1976
|