The data below is included for archival purposes.
The most current data that we have is available via our new searchable
database of ships at:
http://oceanic.cms.udel.edu/ships/
Ship Name: Shumpu Maru (Japan) US NODC Code: 49SU Ministry of Transport
Contact: Mr. I. Eguchi
Operator: Kobe Marine Observatory
7-14-1, Nakayamate-Tori, Chuo-Ku,
Kobe-Shi 100 Japan
Phone: 03 32114966
Fax: 32112032
Cable: METOROAGENCY TOKYO
Email:
Length (M): 48.50 Range (n. mi.): 7000 Crew: 15
Beam (M): 7.80 Endurance (days): 7 Officers: 10
Draft (M): 2.92 Cruise speed (kt): 11.4 Scientists: 10
Gross Tons: 366 Max. speed (kt): 12.5 Air Cond.: no
Power (HP): 750 Aux. Power (HP): 260
Main vessel activity
Oceanography Meteorological Observation
Year built: 74
Ocean area where vessel operates: Pacific, Northwest
Capacities and working spaces
Dry cargo holds: 0m3
Fuel: 98m3
Fresh water: 82m3
Wet laboratories (total area): 28m2
Dry laboratories (total area): 8m2
Fresh water generator capacity: 0m3
Freeboard to working deck: 1.0m
Free working deck area: 0m2
Space for container laboratory: 0m x 0m
Design Particulars
Hull materials: Steel
Energy sources
Main engine(s): number: 1 make: Diesel model:
Power (BHP) each main engine: 750 at 720rpm
Diameter and max. rpm propeller: 1.700m 323rpm
Total power auxiliary diesels: 260HP
Electrical systems
AC Voltage: 0/ 440V, total 200kVA, 3phase, 60Hz
AC Voltage: 0/ 0V, total 0kVA, 0phase, 0Hz
DC Voltage: 0V, total 0V
Stabilized system for scientific equipment: 0VAC 0AMP 0Hz
Fixed equipment
Navigation and communication
Nav. equip: Radar Loran SatNav Gyro EMLog
Comms: Fax
Comm sat:
GPS:
Acoustic
Echosounders for scientific research: 12kHz
Sonar:
Provisions for silent ship operation:
Oceanographic
Oceanographic winches: number: 2
Steel wire length: 2000m, safe working load: 0tons
Conducting cable length: 6000m, safe working load: 1tons
Trawl winch length: 0m, safe working load: 0tons
Other, specify:
length: 0m, safe working load: 0tons
Gantry
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Crane
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Other winches for instruments or sampling:
Electronic data processing equipment permanently available on board
Computer:
Vessel construction and maintenance supervision
Construction supervised by:
Classification Society:
Others, specify:
Published vessel data
Magazine:
|