The data below is included for archival purposes.
The most current data that we have is available via our new searchable
database of ships at:
http://oceanic.cms.udel.edu/ships/
Ship Name: Pusan 802 (Korea, Rep. of) US NODC Code: 24P1 Office of Hydrographic Affairs
Contact:
Operator:
#1-17,7 Ga,Hang-Dong,Chung-Ku
Inchon 400037 Korea, Rep. Of
Phone: 032 8853823
Fax: 8853829
Cable:
Email:
Length (M): 42.00 Range (n. mi.): 30001 Crew:
Beam (M): 7.00 Endurance (days): 20 Officers: 13
Draft (M): Cruise speed (kt): 12.0 Scientists: 7
Gross Tons: 230 Max. speed (kt): 14.0 Air Cond.: yes
Power (HP): 910 Aux. Power (HP):
Main vessel activity
Oceanography Hydrography
Year built: 82
Ocean area where vessel operates: Yellow Sea; Korea Strait; Japan Sea
Capacities and working spaces
Dry cargo holds: 0m3
Fuel: 62m3
Fresh water: 20m3
Wet laboratories (total area): 0m2
Dry laboratories (total area): 0m2
Fresh water generator capacity: 0m3
Freeboard to working deck: 0.0m
Free working deck area: 0m2
Space for container laboratory: 0m x 0m
Design Particulars
Hull materials: Steel
Energy sources
Main engine(s): number: 2 make: Diesel model:
Power (BHP) each main engine: 910 at 1800rpm
Diameter and max. rpm propeller: 0.000m 0rpm
Total power auxiliary diesels: 0HP
Electrical systems
AC Voltage: 0/ 0V, total 100kVA, 0phase, 0Hz
AC Voltage: 0/ 0V, total 0kVA, 0phase, 0Hz
DC Voltage: 0V, total 0V
Stabilized system for scientific equipment: 0VAC 0AMP 0Hz
Fixed equipment
Navigation and communication
Nav. equip: Radar Loran
Comms:
Comm sat:
GPS:
Acoustic
Echosounders for scientific research: 0kHz
Sonar: Geological
Provisions for silent ship operation:
Oceanographic
Oceanographic winches: number: 2
Steel wire length: 5000m, safe working load: 5tons
Conducting cable length: 0m, safe working load: 0tons
Trawl winch length: 1500m, safe working load: 1tons
Other, specify:
length: 0m, safe working load: 0tons
Gantry
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Crane
Position:
Clearance above deck: 0m and outboard extension: 0m
Safe working load at max. reach: 0tons
Other winches for instruments or sampling:
Electronic data processing equipment permanently available on board
Computer:
Vessel construction and maintenance supervision
Construction supervised by:
Classification Society:
Others, specify:
Published vessel data
Magazine:
|