|
The data below is included for archival purposes. Shana_raeShip Name: Shana Rae (USA) US NODC Code: 32R0 Monterey Canyon Research Vessels, Inc. Contact: James C. Christmann Operator: 114 Mason St. Santa Cruz, CA 95060 USA Phone: 408 4234864 Fax: 4231719 Cable: Email: Length (M): 16.00 Range (n. mi.): 1300 Crew: Beam (M): 5.00 Endurance (days): 20 Officers: 2 Draft (M): 2.00 Cruise speed (kt): 8.0 Scientists: 4 Gross Tons: 46 Max. speed (kt): 10.0 Air Cond.: yes Power (HP): 350 Aux. Power (HP): Main vessel activity Oceanography Monitoring,Prototype Development Year built: 80 Ocean area where vessel operates: Pacific, Eastern Central Capacities and working spaces Dry cargo holds: 40m3 Fuel: 10m3 Fresh water: 2m3 Wet laboratories (total area): 12m2 Dry laboratories (total area): 10m2 Fresh water generator capacity: 0m3 Freeboard to working deck: 1.0m Free working deck area: 25m2 Space for container laboratory: 3m x 5m Design Particulars Hull materials: GRP Energy sources Main engine(s): number: 1 make: Diesel model: Power (BHP) each main engine: 350 at 1800rpm Diameter and max. rpm propeller: 1.300m 650rpm Total power auxiliary diesels: 0HP Electrical systems AC Voltage: 110/ 220V, total 20kVA, 3phase, 60Hz AC Voltage: 110/ 220V, total 6kVA, 3phase, 60Hz DC Voltage: 0V, total 0V Stabilized system for scientific equipment: 110VAC 60AMP 60Hz Fixed equipment Navigation and communication Nav. equip: Radar Loran SatNav Comms: Comm sat: GPS: Acoustic Echosounders for scientific research: 0kHz Sonar: Provisions for silent ship operation: Oceanographic Oceanographic winches: number: 0 Steel wire length: 1000m, safe working load: 1tons Conducting cable length: 0m, safe working load: 0tons Trawl winch length: 0m, safe working load: 0tons Other, specify: Stainless Wire length: 150m, safe working load: 2tons Gantry Position: Stern Clearance above deck: 3m and outboard extension: 1m Safe working load at max. reach: 3tons Crane Position: Midships Clearance above deck: 2m and outboard extension: 2m Safe working load at max. reach: 0tons Other winches for instruments or sampling: Electronic data processing equipment permanently available on board Computer: Vessel construction and maintenance supervision Construction supervised by: Classification Society: Others, specify: Published vessel data Magazine: Sea Technology Date: 01-jan-1993 |